Project Title Ministry ID PMO ID LOCATION(GOVERNORATE) Description Estimated Cost SDate EDate
Al Shallalla Weir Rehabilitation Barrage-010 W-R-WR-Dam-096 Anbar Rehabilitate barrage and head regulator to restore safe operations, raising upstream water levels and regulating discharge. Immediate: Impose vehicle load limits. Provide or repair emergency generator. Short Term: Provide permanent power. $500,000 1/1/2008 3/31/2008
Balago Khanakeen Reclamation Project Major-041 W-R-WR-Major-221 Diyala To reclaim agricultural land and reduce losses from the canal network. Improve channel lining for irrigation project serving 3,350 Ha. Construct concrete lined channels and related structures. $5,325,000 8/1/2008 1/31/2009
Basateen Al Nakheel Reclamation Project Major-045
Basrah Reclamation 1,250 ha (hactars), lining canals with its required structure $1,410,000 3/1/2008 8/31/2009
Completion of North Jazeria Project Major-046
Ninewa Project is for irrigation and drainage lands above Mosul. Includes lining of concrete canals, also fill drains, main drains. Reclamation of 10000 hac. `It has been estimated based on historical reclamation projects that the cost generally averages 1500 per hectare. This price includes all lining. This project takes water from Mosul lake by means of the main pumpuin station with a discharge of 45m3/sec to irrigate cross area of 60000 ha. This project was constructed since 1989. All farm irrigated by linear move system. The drainage system in the project is surface drainage. The budget is for execution of the sub-surface drainage system. The project is located about 100 km to the North-west of Mosul governorate and start from Awinat. $15,000,000 1/1/2008 6/30/2009
Construction of Directorate Building in Diala Fac-006
Diyala Construction of Directorate Building in Diala $163,000 8/1/2008 9/30/2008
Construction of Directorate Building in Mosul Fac-005
Mosul Construction of Directorate Building in Mosul $80,000 8/1/2008 9/30/2008
Construction of mobile factories for plastic pipes production Fac-003
Suliamaniyah Construction of a mobile factories for high pressure plastic pipe production. Purpose of these pipes will be for drip irrigation among the various sites in Suliamaniyah. Purpose is to reduce the loss of water. $2,000,000 8/1/2008 9/30/2008
East Jazira Project Major-043
Ninewa Irrigation and drainage project. Irrigation by gravity from Mosul Lake. Open main canal. Max. discharge is 35 cubic meters/sec. Cropping intensity = 123$. Located on left side of Tigris River between the Tigris and the Greater Zab River. This project is considered as a strategic project which irrigates about 75000 ha gross area, and takes water by gravity from Mosul dam. Lake by feeder line canal is 81 km long including 2 tunnel with total length 4.5 km, three lined lateral canal with water coarses covering the area and there are three pumping lift station. On farm irrigation by solid set sprinkler machines, surface drainage applied in the project. The project is located on the left bank of the Tigris River in Hamdania and Mosul Qatha and include all land between Zabana Tigris river and extend to the north up to Kursabad up to Zagross mountain. Al Jazeera eastern irrigation project is one of the three parts of Al Jazeera irrigation project which takes its water from Al Mosul dam’s lake. The topography of the area is represented by its wavy land; therefore they depended on sprinkle irrigation (which is static system). A. The initial designs: The project comprised of a feeding canal with a length of 82, 1 KM, it extends from Al Mosul dam’s lake to Kebarly village in the south east of Al Mosul. There are many pumping stations on the subsidiary feeding canal in order to insure supplying the static systems of sprinkle irrigation with water. The project water intake is connected to Al Mosul dam’s lake with 2 tunnels, the first one is about 1, 9 KM length – there is hydroelectric station at its end in order to generate electricity because there is difference in the level between the back & the front of the tunnel. The second one is not far away from the 1st one and with a length of 1, 17 KM. B. A proposal for changing the initial designs: The proposal for changing initial designs depends on constructing a station or a group of stations on Tigris River and using underground water by digging water wells, and in this way we can dispense with the tunnels mentioned in the 1st design. $120,000,000 8/1/2008 1/31/2008
Excavation of Al-Hashimiyah Main Drain SR-003
Babylon Excavation of Al-Hashimiyah Main Drain $334,000 1/1/2008 3/30/2008
Falluja (3) Reclamation Project Major-042 W-R-WR-Irrigation and Drainage-210 Wassit Improve land production in this region; provide water resource; improve decreasing groundwater level. Project consists of construction of a concrete-lined irrigation channel with associated structures. New drainage channels will also be excavated. The project covers an area of approximately 6,250 hectares $9,375,000 8/1/2008 1/31/2008
Hussub Dam Construction Dam-033 W-R-WR-Dam Rural-186 Najaf Construction of earth fill dam on Hussub Wadi in the western desert. Dam would be 1,050 meters in length, 11.5 meters in height, and would provide 4.2 Million CM of storage with an ungated concrete spillway and bottom outlet (0.80 meter diameter steel pipe). $1,040,000 1/1/2008 6/30/2008
Ishaqi Irrigation and Drainage Project - Equipment Replacement IR-042 W-R-WR-PS and G-235 Salah al-Din Includes replacement of: pumps, motors, electrical installation, cables, complete sets of accessories. $1,605,000 6/1/2008 11/30/2009
Kahlaa Drainage Pumping Station PS-051 W-R-WR-PS and G-241 Missan Provide pump capacity to remove and convey drainage water. Provide vertical pumps with unit capacity of 1.5 CMS. Projected head equals 10.0 meters. Includes the following: pumps and motors complete, electrical installation, cables, and complete sets of accessories. Pumps to be installed within new pump house. $1,800,000 6/1/2008 8/30/2008
Karbala Irrigation and Drainage Project, Razaza Drainage P.S. 02 - Replacement PS-054 W-R-WR-PS and G-142 Kerbala Remove and convey drainage water. Provide five (5) vertical pumps with unit capacity of 20 CMS. Projected head equals 23 meters. Design documentation is complete. $7,250,000 9/1/2008 11/30/2008
Khuraisan (Sariya) Project Canal Lining IR-039
Diyala Canal lining; to increase the agricultural land. $5,000,000 8/1/2008 11/30/2008
Lining with stone the embankment of Tigris in Al Nomania IR-038
Kut Lining with stone embankment of Tigris $167,000 1/1/2008 4/30/2008
Maintenance of existing irrigation projects IR-041
Suliamaniyah Maintenance of existing irrigation projects $4,000,000 4/1/2008 3/31/2008
Provision of Euphrates Pumping Station Operator Housing PS-053 W-R-WR-PS and G-269 Nationwide Provide residential structures, independent from the pumping station structure. Houses shall be 80-120 square meters in area, single storied, with two bedrooms, kitchen, living area, and bathroom/utility room. Water purification shall be by small package plant. Sewage disposal shall be by septic tank and/or leech field as appropriate. Structure shall be sited with provisions for future garden plot and livestock pen. $4,000,000 4/1/2008 4/1/2008
Provision of Tigris Residence Houses Fac-004 W-R-WR-PS and G-270 Nationwide Provide residential structures, independent from the pumping station structure. Houses shall be 80-120 square meters in area, single storied, with two bedrooms, kitchen, living area, and bathroom/utility room. Water purification shall be by small package plant. Sewage disposal shall be by septic tank and/or leech field as appropriate. Structure shall be sited with provisions for future garden plot and livestock pen. $5,000,000 8/1/2008 9/1/2008
Surface irrigation resources surveying IR-044
Suliamaniyah Surface irrigation resources surveying $400,000 1/1/2008 3/31/2008