| Al Jazira Irrigation Pumping Station Rehabilitation |
PS-025 |
W-R-WR-PS and G-082 |
Ninewa |
Upgrade security and communications. Repair new cooling water pumps. Acquire three sets of spare control system parts. Continue or initiate a project appropriate security staff and procedures. Restore and upgrade an organization-wide communication system. Immediate: Pumping station cooling water supply pumps need repairs and spare parts for the plant controls. Plant reliability and the irrigation of 60,000 hectares are at high risk. Short Term: Initiate design of new PC-based control system. |
$1,776,000 |
10/1/2006 |
4/30/2007 |
| Al Rumitha Reclamation Project |
Major-026 |
|
Muthanna |
Project is for irrigation and drainage. Includes lining of concrete canals, also fill drains, main drains. Reclamation of 10000 hac. `It has been estimated based on historical reclamation projects that the cost generally averages 1500 per hectare. This price includes all lining. |
$15,000,000 |
6/1/2006 |
11/30/2007 |
| Construction of Basora Dam |
Dam-019 |
|
Suliamaniyah |
Construction of Basora Dam for purposes of water storage.. Dam is 53 m height, 350 m length. 2600 hac. This dam is also a ground water recharge upstream of the dam as well as irrigation downstream of the dam. Basora dam regulates water in one of the branches (small river) of Al Adhaim Dam. This dam is located on the Tawouk Chai River. It is Southwest of Suliamaniyah City. |
$40,000,000 |
3/1/2006 |
8/31/2007 |
| Diwaniya Saffiya Reclamation Project |
Major-029 |
W-R-WR-Irrigation and Drainage-227 |
Qadisiyah |
Improve land productivity in this region; provide water resource; improve decreasing groundwater level; increase food production; provide increased work opportunities, provide initial requirement for local industry; and improving the quality and quantity of the livestock production. The project includes the construction of a complete irrigation and drainage system. The irrigation network is divided into three parts, each irrigated by a main canal, as follows:
1. MC1 canal, 17,800 hectares, left side of Shatt Al-Diwaniya, 1 pumping station
2. MC3 canal, 48,600 hectares, left side of Shatt Al-Diwaniya, 1 pumping station
3. MC2 canal, 87,000 hectares, left side of Shatt Al-Diwaniya, 1 pumping station.
The drainage network comprises of 2 main drains, MD1 (on the left side of the project) and MD2 (on the right side of the project). MD1 goes to the Rumeitha drain (D3) at km 26.400 via pumping station; the length of this drain is about 42.120 km and it serves about 37,000 Hectares. MD2 goes to the Euphrates eastern drain at km 40.300 via pumping station; the length of this drain is about 58.100 km and it serves about 57,750 hectares.
The project locates in Euphrates river basin to the south of Baghdad city about 200KM and it goes along the 2 sides of Shatt Al Diwaniya – from the north of Al Diwaniya to Al Najmi canal which is branched from the left of Shatt Al Diwaniya –The south of Al Hamzah city. Shatt Al Diwaniya which is branched from Shatt Al Hilla tails is considered the main source of irrigation in the project’s area.
A. Irrigation network : According to the proposal of developing irrigation network of Al Diwaniya – Shafi`ya project, this project is divided into 3 parts each part is irrigated by a main canal, and as the following:
• The 1st part: It is irrigated by the canal (MC1) for a net area which is about (31880) acres and it locates to the left side of Shatt Al Diwaniya.
• The 2nd part: It is irrigated by the main canal (MC3) for a net area which is about (113608) acres and it locates to the left side of Shatt Al Diwaniya also.
• The 3rd part: It is irrigated by the main canal (MC2) for a net area which is about (202960) acres and it locates to the right side of Shatt Al Diwaniya. In addition to the above canals, this network includes minor feeding & distributing canals lined with concrete.
B. Drainage network:
The proposed drainage network for the project comprises of 2 main drains– one of these drains is on the left side of the project, & this main drain is called (MD1), the other one is on the right side, & it is called (MD2).
The drainage of the drain ( MD1) goes to Al Rumeitha drain (D3)at the kilometer (26,400) via pumping station , the length of this drain is about (42,120) KM into which many minor & collecting drains flow , and it serves about (31435) hectares .
The drain (MD2) serves net area about (49049) hectares, its drainage goes to Euphrates eastern drain at the kilometer (121) via pumping station to raise water at the kilometer (40,300), its length is about
(58,100)KM into which many minor & subsidiary drains flows.
In addition to what is mentioned above, the irrigation & drainage networks comprise of necessary structures and they are: regulators of canals upstream, cutting regulators, pedestrian & cars bridges, and those structures also include drainage & intersections outfalls.
Three irrigation pumping stations has been defined, one to the upstream of each main canal & two pumping stations (raising drainage) one in each main drainage. |
$37,305,000 |
3/1/2006 |
9/30/2084 |
| Eastern Gharraf Reclamation Project |
Major-021 |
W-R-WR-Major-207 |
Wassit |
Improve land production in this region; provide water resource; improve decreasing groundwater level. The entire project area covers approximately 118,750 hectares, 75,000 in ThiQar governorate and 43,750 in Waseet governorate. |
$38,158,000 |
10/1/2006 |
4/30/2007 |
| Hilla Kafil Reclamation Project |
Major-031 |
W-R-WR-Major-217 |
Babylon |
Improve land production. Provide a water resource. Slow decreasing groundwater levels. Reclaim 5,400 hectares on the right side of the Euphrates River, west of the Hella River, and to the north of the Hella-Kafil Road. The proposed work is to irrigate the southern portion of the Irrigation Project. |
$23,022,000 |
3/1/2006 |
8/31/2007 |
| Hilla-Dewaniya Reclamation Project |
Major-027 |
W-R-WR-Major-214 |
Babylon |
Improve land production in this region; provide water resource; improve decreasing groundwater level. Project consists of reclamation through construction of new irrigation and drainage networks with associated structures, and irrigation and drainage pump stations. The project covers a total area of approximately 292,000 hectares. |
$191,853,000 |
4/1/2006 |
9/30/2006 |
| Iskandriya-Mahawell Projects |
IR-024 |
|
Babylon |
To improve and increase the agricultural lands; provide water resource; improve decreasing groundwater level. The project will consist of construction of concrete-lined irrigation canals, a drainage system, and required structures. |
$15,000,000 |
6/1/2006 |
11/30/2007 |
| Khazir-Komal Irrigation Project Construction |
IR-020 |
|
Arbil |
Construction of the project, have relation with Bakerman Dam. The project can be irrigated only after Bakerman regulating dam construction. This project covers a net irrigated area about 31900 ha. By mean of two main canals, the west canal which is about 44km and covers 12400 ha and the east channel which covers 19500 ha. All farms in the project irrigated by solid set sprinkler machine. The project consists of Bakerman and Kalikan regulating dam, with hydropower and net irrigation work.
The project is located about 40 km NE of Mosul and covers the land of Zab and Tigris basin in Aqra and Shekan Qatha |
$20,000,000 |
8/1/2006 |
1/31/2007 |
| Left Al-Adheem Reclamation Project (Ausser Eudhaim) (Phase II) |
Major-009 |
|
Diyala |
Continuation of Left Al-Adheem Reclamation Project (Ausser Eudhaim) (Phase I) Improve land production in this region; provide water resource, widen the agricultural area and to improve the economical and socials status of the people who live in this area. Approximately 90% of the people in this area (roughly 15,000 persons) are dependent upon agriculture for their livelihood. It includes 25,250 hectares. The project will consist of construction of concrete-lined irrigation canals, a drainage system, and land leveling for the first stage of 10,250 hectares (Sector 7 of Kirkuk Project).
The project area lies roughly 40 kilometers from Khalis, to the south of the Eudhaim River, north of the Tigris River and north of the Al-Nai Reclamation Project. Source water is the Al Adhaim River. The proposed irrigation system will utilize existing topography as much as practicable. |
$15,000,000 |
5/1/2006 |
10/31/2007 |
| Lining of Al Ishaki Western Canal |
IR-011 |
|
North Baghdad |
Lining Al Ishaki Western Canal; lining of canal with .1 m thick concrete including earth works to complete the required canal sections such as excavation, backfilling, trimming, etc. |
$6,000,000 |
10/1/2006 |
1/31/2006 |
| Lining of Al Kamaliyah canal in Karba |
IR-014 |
|
Kerbala |
Lining of Al Kamaliyah canal in Karba with .1 m thick concrete including earth works to complete the required canal sections such as excavation, backfilling, trimming, etc. |
$300,000 |
10/1/2006 |
1/31/2006 |
| Makhmoor Project |
IR-021 |
|
Arbil |
Irrigation by pumping from Tigris. Project located on left side of Tigris River in Makhmoor areas. Total area = 55000 hac. To increase the agricultural land.
This project will change rain feel area to irrigated area in five places:
1. Makhmoor Project
2. Zab river plains
3. Tigris river plain by mean of feeder canal off taking from u/s of ifraz weir the canal length 84km the other places
4. Tigris river plain in Abasian
5. Tigris river plain near Zab
Areas are irrigated by direct pumping.
The project located S.E. of Mosul on left bank of Tigris, Greater Zab in north and Tigris River in East and Lower Zab in the South and in the east Karajook. |
$15,000,000 |
8/1/2006 |
1/31/2007 |
| Provide pumps for Hafria Drainage Pumping Station |
PS-033 |
W-R-WR-PS and G-271 |
Wassit |
Provide pump capacity to remove and convey drainage water. Provide vertical pumps with unit capacity of 1.5 CMS. Projected head equals 8.0 meters. Includes the following: pumps and motors complete, electrical installation, cables, and complete sets of accessories. Pumps to be installed within new pump house. |
$3,198,000 |
8/1/2006 |
8/1/2007 |
| Provide pumps for Hafria Drainage Pumping Station |
PS-027 |
W-R-WR-PS and G-244 |
Wassit |
Provide pump capacity to remove and convey drainage water. Provide vertical pumps with unit capacity of 1.6 CMS. Projected head equals 8.0 meters. Includes the following: pumps and motors complete, electrical installation, cables, and complete sets of accessories. Pumps to be installed within new pump house. |
$3,198,000 |
6/1/2006 |
6/1/2007 |
| Provide pumps for Hilla Irrigation Project (North Hussinia Drainage Pumping Station) |
PS-032 |
W-R-WR-PS and G-150 |
Babylon |
Provide pump capacity to convey drainage water. Provide vertical pumps with unit capacity of 1.75 CMS total station capacity. Projected head equals 10.0 meters. Includes the following: pumps and motors complete, electrical installation, cables, and complete sets of accessories. |
$1,794,000 |
8/1/2006 |
8/1/2007 |
| Provide pumps for Hussina Beni Hassan Irrigation Project (North Pump Station) |
PS-031 |
W-R-WR-PS and G-152 |
Kerbala |
Provide pump capacity to remove and convey drainage water. Provide vertical pumps with unit capacity of 1.75 CMS total station capacity. Projected head equals 10.0 meters. Includes the following: pumps and motors complete, electrical installation, cables, and complete sets of accessories. Pumps to be installed within existing pump house. |
$959,000 |
8/1/2006 |
8/1/2007 |
| Provide pumps for Hussinia Beni Hassan Irrigation Project (Sigilla Drainage Pump Station) |
PS-038 |
W-R-WR-PS and G-151 |
Kerbala |
Provide pump capacity to remove and convey drainage water. Provide vertical pumps with unit capacity of 1.125 CMS. Projected head equals 17.0 meters. Includes the following: pumps and motors complete, electrical installation, cables, and complete sets of accessories. |
$497,000 |
10/1/2006 |
10/1/2007 |
| Provide pumps for Kesaba Drainage Pumping Station |
PS-030 |
W-R-WR-PS and G-245 |
Wassit |
Provide pump capacity to remove and convey drainage water. Provide vertical pumps with unit capacity of 0.93 CMS. Projected head equals 4.6 meters. Includes the following: pumps and motors complete, electrical installation, cables, and complete sets of accessories. Pumps to be installed within existing pump house. |
$1,723,000 |
8/1/2006 |
8/1/2007 |
| Provide pumps for Khalis Irrigation and Drainage Project, Lower Khalis Irrigation P.S. |
PS-040 |
W-R-WR-PS and G-163 |
Diyala |
Provide pump capacity for local irrigation to increase the agricultural lands. Provide vertical pumps with unit capacity of 5.0 CMS. Projected head equals 21.0 meters. Detailed design required. Includes the following: pumps and motors complete, electrical installation, cables, complete sets of accessories, and new civil works. |
$23,982,000 |
10/1/2006 |
10/1/2007 |
| Provide pumps for Samawa Irrigation Project (Swair Irrigation Pumping Station) |
PS-037 |
W-R-WR-PS and G-148 |
Muthanna |
Provide pump capacity for local irrigation. Provide horizontal pumps with unit capacity of 2.0 CMS. Projected head equals 10.0 meters. Includes the following: pumps and motors complete, electrical installation, cables, and complete sets of accessories. This will replace the existing pumping station. |
$6,662,000 |
10/1/2006 |
10/1/2007 |
| Provide pumps for Shehamia Drainage Pumping Station |
PS-029 |
W-R-WR-PS and G-242 |
Wassit |
Provide pump capacity to remove and convey drainage water. Provide vertical pumps with unit capacity of 1.6 CMS. Projected head equals 4.45 meters. Includes the following: pumps and motors complete, electrical installation, cables, and complete sets of accessories. Pumps to be installed within new pump house. |
$1,723,000 |
8/1/2006 |
8/1/2007 |
| Provide pumps for Sheikh Lengar Reclamation Project |
Major-040 |
W-R-WR-Major-220 |
Diyala |
To reclaim agricultural land and reduce losses from the canal network. Improve channel lining for irrigation project serving 3,350 Ha. Construct concrete lined channels and related structures. |
$142,824,000 |
8/1/2006 |
1/31/2007 |
| Provide pumps for Tarmiya Drainage Pumping Station |
PS-028 |
W-R-WR-PS and G-166 |
Salah al-Din |
Provide pump capacity for local drainage pumps to protect adjacent lands from inundation. Provide vertical pumps with unit capacity of 2.25 CMS. Projected head equals 7.75 meters. |
$2,842,000 |
8/1/2006 |
8/1/2007 |
| Ramadi Irrigation Pumping Station No. 01 Rehabilitation |
PS-036 |
W-R-WR-PS and G-145 |
Anbar |
Provide pump capacity for local irrigation. Rehabilitate the Ramadi drainage pumping station Number 01. Provide three (3) vertical pumps with unit capacity of 0.75 CMS. Projected head equals 13.0 meters. Includes the following: pumps and motors complete, electrical installation, cables, and complete sets of accessories. |
$471,000 |
3/15/2006 |
9/30/2007 |
| Ramadi Reclamation Project (No. 2) |
Major-024 |
|
Anbar |
Construction including lining, land leveling and addition of structures to increase and improve the agricultural lands. |
$15,000,000 |
6/1/2006 |
11/30/2006 |
| Rehabilitation of Dijella Projects (9,10,11) - Various Projects |
Major-030 |
|
Wassit |
Project is for irrigation and drainage lands in Southern Iraq. Includes lining of concrete canals, also fill drains, main drains, precision land leveling. Reclamation of 10000 hac. `It has been estimated based on historical reclamation projects that the cost generally averages 1500 per hectare. This price includes all lining. |
$10,000,000 |
1/1/2006 |
6/30/2007 |
| Rehabilitation of Musaib Project - Lining and field drains. |
Major-037 |
|
Babylon |
Lining and field drains; to improve and increase the agricultural land. Total project area = 84250 ha. |
$10,000,000 |
8/1/2006 |
1/31/2008 |
| Rhauda Dam Construction |
Dam-021 |
W-R-WR-Dam Rural-185 |
Anbar |
Construction of earth fill dam on Wadi Al Ghadaf in the western desert. Dam would be 1,245 meters in length, 11.5 meters in height, and would provide 6.9 Million CM of storage with an ungated concrete spillway and bottom outlet. |
$4,032,000 |
1/1/2006 |
8/31/2007 |
| Rutba Dam Maintenance |
Dam-022 |
|
Anbar |
Maintenance for Rutba Dam and construction of an office for the resident engineer in Rutba. |
$70,000 |
5/1/2006 |
9/1/2007 |
| Saragawa Project |
IR-023 |
|
Suliamaniyah |
To improve and increase the agricultural lands |
$10,000,000 |
6/1/2006 |
11/30/2006 |
| Selevanee Plane and Small Projects |
IR-022 |
|
Duhuk |
To improve and increase the agricultural lands |
$2,000,000 |
6/1/2006 |
11/30/2006 |
| Shamamouk Irrigation Project |
IR-018 |
|
Arbil |
To increase the agricultural land. |
$4,000,000 |
1/1/2006 |
6/30/2007 |
| Tak Tak Dam Construction |
Dam-018 |
|
Arbil |
Construction of reregulating earth dam downstream from Dokan dam. Purpose of dam is for storage of water, agriculture, power generation, and flood control. Dam to be located 6km upstream of Arbil government. Upper level = 423m, storage level =415m, total height = 100m. |
$1,000,000,000 |
6/1/2006 |
11/30/2007 |
| Vehicles |
Equip-011 |
|
Nationwide |
The Ministry will need several different types of equipment to perform this function such as:
50 FPS vehicles (landcruiser or double cab trucks)
100 Station landcruisers
500 dual cab hi-lo type trucks |
$12,150,000 |
3/1/2006 |
3/1/2006 |
| Wadi Al Nafat Dam Construction |
Dam-012 |
W-R-WR-Dam Rural-189 |
Diyala |
The Wadi Al Nafat Dam is used for irrigation and water storage for drinking water. This will provide water to the Bedwin people and their sheep. Construction of earth fill dam on Wadi Al Nafat in the eastern region. |
$8,882,000 |
6/6/2006 |
11/30/2006 |
| Zakho Project |
IR-019 |
|
Duhuk |
To improve and increase the agricultural lands. Total project area = 13400 hac. Irrigated by pumping and gravity from Khabour River the farm irrigation (gravity, sprinklies, drip)
Cropping intensity = 128% |
$7,500,000 |
6/1/2006 |
11/30/2007 |